LOCATION: SEPLAT Gas Gathering Station, Sapele.
More on this project.• LV & MV Switchgear Pre Commissioning Test.
• Relay Parameterization.
• Transformer & MV Cable Pre Commissioning Test.
LOCATION: Escravos, Delta State.
More on this project.• MV cable testing
• Switchgear electrical tests
• Transformer electrical tests
• Grid impedance test
LOCATION: KOLO Creek, Bayelsa State.
More on this project.LOCATION: Shell Petroleum Development Company of Nigeria Limited (SPDC)
More on this project.LOCATION: ExxonMobil Field, Ibeno, Akwa Ibom State
More on this project.LOCATION: ExxonMobil Field, Ibeno, Akwa Ibom State
More on this project.LOCATION: Madu Platform -FPSO Offshore Golf of Guinea
More on this project.S/N | Description | Client | Date |
---|---|---|---|
1 | SPDC Batam, Egwa I & II Flow stations, HV cable equipment pressure testing and vibration testing of electric motors. | Daewoo Nig. Ltd. | 2002 |
2 | Repairs, Installation and testing of protective device, Oil draining, Oil filtration and refilling of 1 No. 122MVA /132KV ABB transformer | Ajaokuta Steel Co. | 2002 |
3 | Repair and Commissioning of 1 No. 122MVA/132KV ABB transformer motorized tap changer | Ajaokuta Steel Co. | 2002 |
4 | Testing of HV/ LV Cables and Switch gears at Escravos NNPC Tank Farm TK107 substation | Daewoo Nig. Ltd. | 2002 |
5 | Installation, testing and commissioning of NNPC Tank Farm TK107 cathodic protection system at Escravos. | Daewoo Nig. Ltd. | 2003 |
6 | SPDC Bonny Terminal Additional Fuel Gas Plant HV equipment installation, cable splicing/termination and commissioning of 11KV substation | ABB Lumus Global | 2003 |
7 | Installation of heater panels, Inverter, UPS and substation equipment modification project | ABB Lumus Global | 2003 |
8 | Fabrication and installation of HVAC unit at NAOC Gas Plant Project, Okpai | Daewoo Nig. Ltd. | 2003 |
9 | Fabrication, Lagging and Installation of PVC exhaust ducts chambers for battery rooms & gas turbine exhaust chambers at NAOC Gas Plant Project, Okpai | Daewoo Nig. Ltd. | 2003 |
10 | SPDC Cawthorn Channel AGG Projects / Bonny (BCOT) glanding and termination of HV cable on 33KV transformers and switch gears | Daewoo Nig. Ltd. (DN 38) | 2004 |
11 | SPDC Cawthorn Channel AGG Projects / Bonny (BCOT) transformers oil dielectric strength test, oil treatment and oil filling | Daewoo Nig. Ltd. (DN 38) | 2005 |
12 | SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Batam, Egwa I & II Flow stations, HV cable/equipment pressure testing and vibration testing and commissioning of electric motors. | Daewoo Nig. Ltd. | 2002 |
13 | Repairs, Installation and testing of protective device,Oil draining, Oil filtration, refilling, testing and commissioning of 1 No.122MVA | Ajaokuta Steel Co | 2002 |
14 | 132KV ABB transformer Repair and Commissioning of 1 No. 122MVA/132KV ABB transformer motorized tap changer | Ajaokuta Steel Co. | 2002 |
15 | Testing and Recertification of HV/ LV Cables and Switch gears at NNPC Escravos Electrical Substation | Daewoo Nig. Ltd. | 2003 |
16 | NNPC Tank Farm TK107 substation Installation, testing and commissioning of NNPC Tank Farm TK107 cathodic protection system atE scravos. | Daewoo Nig. Ltd | 2003 |
17 | SPDC Bonny Terminal Additional Fuel Gas Plant High Voltage equipment installation, cable splicing/termination, testing and commissioning of 11KV Electrical substation | ABB Lumus Global | 2003 |
18 | SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Installation of heater panels, Inverters, UPSand substation equipment modification project | ABB | 2003 |
19 | Fabrication and installation of HVAC units at NIGERIA AGIP OIL COMPANY (NAOC) Gas Plant Project, Okpai | Daewoo Nig. Ltd. | 2003 |
20 | Fabrication, Lagging and Installation of PVC exhaust ducts chambers for battery rooms & gas turbine exhaust chambers at NAOC Gas Plant Project,Okpai | Daewoo Nig. Ltd. | 2003 |
21 | SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Cawthorn Channel AGG Projects / Bonny (BCOT) installation,glanding and termination of HV cable on 33KV transformers and switch gears | Daewoo Nig. Ltd. (DN 38) | 2004 |
22 | SPDC Cawthorn Channel AGG Projects / Bonny (BCOT) transformers oil dielectric strength test,oil treatment, oil filling and commissioning | Daewoo Nig. Ltd. (DN 38) | 2005 |
23 | NAOC OB-OB Gas Plant NLNG Pig Launchers/ Receivers facilities area lighting installation | Daewoo Nig. Ltd. (DN 41) | 2004 |
24 | Fabrication, Lagging and Insulation work on hot gas pipelines at NAOC gas plant project, Okpai | Daewoo Nig. Ltd. | 2004 |
25 | Fabrication, Lagging and Insulation of personnel protection (air-cooler units) at NAOC Gas Plant Project | Daewoo Nig. Ltd. | 2004 |
26 | Revamping/Expansion of Star Paper Mill Plants, Owerrintan mechanical/electrical facilities | Energy Equipment Ltd., Onne | 2005 |
27 | SPDC/Offshore Gas Gathering Facilities Project: Electrical/ Instrumentation installation work,Bonny (Manpower/Logistics) | Willbros Nig. Ltd. | 2003/2005 |
28 | Total/Elf Akogep Facilities Projects: Electrical/ Instrumentation installation work, Bonny (Manpower /Logistics) | Willbros Nig. Ltd. | 2005/2006 |
29 | SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Bonny Oil and Gas Terminal Integrated Projects: Mechanical/Manual Electrical Cable Pulling in new facilities | Hyundai Heavy Industry | 2006 |
30 | SPDC Bonny Oil and GasTerminal Integrated Project: Electrical/Instrumentation installation work, HV/LV equipment installation, cable glanding, splicing/termination, Testing and equipment commissioning | Hyundai Heavy Industry | 2006/2007 |
31 | SPDC, AFAM VI IPP Power Project: Installation,Testing and Commissioning of Switchyard Equipment | Daewoo E&C | 2006 |
32 | Mobil Producing Nigeria, Bonny Rivers Terminal Expansion Project: Electrical/Instrumentation installation work, HV/LV cable glanding & termination,testing and commissioning | Daewoo Nig. Ltd. | 2007 |
33 | Opuama Community rural electrification equipment/materials supply, construction, installation and commissioning | AUNL SPDC Warri | 2007 |
34 | Re-routing of 33KV power and fibre optic cables from PS1 to PS2. Installation of power management system panel and termination/splicing of 33KV/24 Core multimode fibre optic cable from SPDC Bonny terminal power supply to SPDC Cawthorn channel gas project | ENL/ SPDC | 2007/2008 |
35 | Oil regeneration and oil dielectric strength test for 2Nos. 15MVA, 4 Nos. 2.5MVA & 2 Nos. 1.5MVA GEPROLEC transformers at Escravos Gas Plant Phase 3 project | Hyundai Heavy Industries | 2009 |
36 | Skilled manpower supply service for construction, Precommissioning and commissioning of Ambatovy Refinery Project, Madagascar | KH Petrotec, Madagascar | 2009/2010 |
37 | Oil regeneration, oil filling and oil dielectric strength testing of Power and Distribution Transformers at Escravos Gas To Liquid project | Southern Gas Constructor | 2009 |
38 | SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Kolo Creek 33KV/11KV Electrical switchyard equipment | Daewoo E & C. | 2010 |
39 | Installation and commissioning Equipment, Materials and Skill Manpower supply service for the construction of Gbaram-Ubie Integrated Oil and GasProject | Daewoo E & C. | 2011/2012 |
40 | Construction of 1.6km road at Umusam Kwale | Energia Oil Limited | 2012 |
41 | Transformer pre-commissioning tests, oilregeneration, Radiators installation,oil filling and oil dielectric strength test for 40 Nos.16MVA/12MVA/10MVA/2.5MVA /1.5MVA GEPROLEC Transformers in various Electrical Substation at Chevron Escravos Gas To Liquid project | Southern Gas Constructor | 2011/2012 |
42 | Provision of Instrumentation and Electrical Call Out Contract (2013-2016) | Chevron Nigeria Limited | 2013/2016 |
43 | Abiteye Escravos 16" Gas Pipeline Project Cathodic Protection Installation and commissioning | Chevron Nigeria | 2014 |
44 | SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Otumara DOMGAS –Electrical Switchgear and transformers Commissioning | Daewoo E & C | 2016 |
45 | Meren PP composite submarine cable testing, splicing, termination work | Chevron Nigeria Limited | 2016 |
46 | Testing, splicing, termination and commissioning of Subsea Electro-Optical Power Umbilical; 3 x 240mmSq 19/33 kV + 3x12 optic fiber and 3x120mmSq 19/33 kV+ 3x12 optic fiber cables | SELAH MARINE/ SPDC | 2017 |
47 | Construction of cooling tower foundation for OPAC, Kwale | OPAC Refinery | 2018 |
48 | Construction of 4 Pump Foundation in Kwale | Midwestern Oil & Gas | 2018 |
49 | Okpai Power Station (IPP) 330KV Switchyard installation upgrade and commissioning – Phase2 | SIELTE Nig. Limited | 2018/2019 |
50 | EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) Commissioning test of over 20 Nos. switchgear assembly in building 1- 11; comprising of Powell PowlVac Arc Flash Resistant VacuumCircuit Breakers, General Electric Multilin Relays – Models SR469 Motor Management Relay, SR489 Generator Management Relay, SR745 Transformer management Relay, SR750 | Westfield Energy Resource / NETCO | 2018/2019 |
51 | Feeder Management Relay etc. EXXON MOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) High/Medium voltage cable arrangement, testing,splicing and termination and commissioning test on 8 | Tombim Services Limited/ NETCO | 2018/ 2019 |
52 | Nos. power transformers EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) High/Medium/Low voltage electrical/instrument cable arrangement, testing, splicing and termination and testing/commissioning test of 18 Nos. power transformers | NestOil Limited/ NETCO | 2018/2019 |
53 | Provision of Instrumentation and Electrical Call Out Service Contract (Amendment 5) | Chevron Nigeria Limited | 2020 |
54 | EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) Installation and Tie – In, Commissioning of End Devices (MOVs, RTD Sensors, Pressure Transmitters, Pumps and Actuators | Westfield Energy Resource / NETCO | 2021 |
55 | EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) Restoration and Correction of Fiber Optic Networks, Condensates PLC logic errors, CCR SCADA,HMI graphic display; Replacement of faulty DHRIO modules and dynamic commissioning. | FinanceGuru | 2020/2021 |
56 | ExxonMobil ERHA FPSO Transformers repair/maintenance and Oil filtration/testing | SPIE ENG. SERVICES/ EXXONMOBIL | 2021 |
57 | SPDC Kolo Creek Gas facilty MV Cables VLF testing and Power Transformer Precommissioning test. | Morpol Eng. Services Ltd | 2021 |
58 | SPDC Gbaran Ubie Phase 3A Enwhe Project High Voltage Cable Termination, Testing, Power Transformers and Switchgear Testing and Commissioning | DAEWOO NIG.LTD | 2022 |
59 | EXXONMOBIL ERHA FPSO 2x25MVA Transformers Leaking Bushings Repairs and Filtration/Regeneration. | SPIE Services/ EXXONMOBIL | 2022 |
60 | EXXONMOBIL ERHA FPSO Danfoss Systems Cable Laying, Glanding,Termination and Testing | EXXONMOBIL/ LES Energy | 2022/2023 |
61 | EXXONMOBIL ERHA FPSO Troubleshooting and Execution of DNV Electrical and Instrumentation work | EXXONMOBIL/ LES ENERGY | 2023 |
62 | DEXXONMOBIL ERHA FPSO Danfoss System Restoration- HPU Troubleshooting and repairs | EXXONMOBIL/ LES ENERGY | On-going |
63 | MADU CSP OFFSHORE Platform Flexible Risers and Medium Voltage Umbilical Cables underwater Laying and Repair | FIRST E &P | 2023 |
64 | NNPC Kaduna Refinery Quick-Fix Project: Construction, Installation and Commissioning of MV/LV Electrical Substations, includingprovision of Distribution Transformers. | Daewoo Engineering Ltd | 2023/2024 On-going |
65 | NNPC Warri Refinery Quick-Fix : Installation and commissioning of Digital metering units for 33KV, 6.6KV and 3.3KV Switchgears in 7nos. Electrical Substations | NNPC/WRPC | 2024 |
66 | EXXONMOBIL ERHA FPSO Faulty Transformers repairs and overhauling | SPIE/EXXONM OBIL | On-going |
67 | Equipment Rental/Materials/Skill Manpower supply services | Various Clients | On-going |