PROJECTS
EXECUTED.

Our diverse range of projects, showcasing our expertise in delivering high-quality results for our clients.

FAFA SYSTEMS NIGERIA Limited

Here are some of our executed projects.

Electromechanical Inspection for SEPLAT Gas Gathering Station, Sapele.

LOCATION: SEPLAT Gas Gathering Station, Sapele.

More on this project.

ESCRAVOS PRODUCE WATER DISPOSAL (EPWD) PROJECT.

LV & MV Switchgear Pre Commissioning Test.

Relay Parameterization.

Transformer & MV Cable Pre Commissioning Test.

LOCATION: Escravos, Delta State.

More on this project.

Pre commissioning tests Kolo Creek Power Upgrade Project SPDC

MV cable testing

Switchgear electrical tests

Transformer electrical tests

Grid impedance test

LOCATION: KOLO Creek, Bayelsa State.

More on this project.

FOT-OBOTOBO 33kV + Fiber Optic Subsea Cable Laying, Termination and Testing Project

LOCATION: Shell Petroleum Development Company of Nigeria Limited (SPDC)

More on this project.

Electrical tests on medium voltage switchgears, QIT Power Distribution Upgrade Project.

LOCATION: ExxonMobil Field, Ibeno, Akwa Ibom State

More on this project.

CO2 Fire Detection and Suppression System.

LOCATION: ExxonMobil Field, Ibeno, Akwa Ibom State

More on this project.

First E&P Madu SURF Subsea Umbilical Cables Repair.

LOCATION: Madu Platform -FPSO Offshore Golf of Guinea

More on this project.

More Executed Projects:

12002
Description: SPDC Batam, Egwa I & II Flow stations, HV cable equipment pressure testing and vibration testing of electric motors.
Client: Daewoo Nig. Ltd.
22002
Description: Repairs, Installation and testing of protective device, Oil draining, Oil filtration and refilling of 1 No. 122MVA /132KV ABB transformer
Client: Ajaokuta Steel Co.
32002
Description: Repair and Commissioning of 1 No. 122MVA/132KV ABB transformer motorized tap changer
Client: Ajaokuta Steel Co.
42002
Description: Testing of HV/ LV Cables and Switch gears at Escravos NNPC Tank Farm TK107 substation
Client: Daewoo Nig. Ltd.
52003
Description: Installation, testing and commissioning of NNPC Tank Farm TK107 cathodic protection system at Escravos.
Client: Daewoo Nig. Ltd.
62003
Description: SPDC Bonny Terminal Additional Fuel Gas Plant HV equipment installation, cable splicing/termination and commissioning of 11KV substation
Client: ABB Lumus Global
72003
Description: Installation of heater panels, Inverter, UPS and substation equipment modification project
Client: ABB Lumus Global
82003
Description: Fabrication and installation of HVAC unit at NAOC Gas Plant Project, Okpai
Client: Daewoo Nig. Ltd.
92003
Description: Fabrication, Lagging and Installation of PVC exhaust ducts chambers for battery rooms & gas turbine exhaust chambers at NAOC Gas Plant Project, Okpai
Client: Daewoo Nig. Ltd.
102004
Description: SPDC Cawthorn Channel AGG Projects / Bonny (BCOT) glanding and termination of HV cable on 33KV transformers and switch gears
Client: Daewoo Nig. Ltd. (DN 38)
112005
Description: SPDC Cawthorn Channel AGG Projects / Bonny (BCOT) transformers oil dielectric strength test, oil treatment and oil filling
Client: Daewoo Nig. Ltd. (DN 38)
122002
Description: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Batam, Egwa I & II Flow stations, HV cable/equipment pressure testing and vibration testing and commissioning of electric motors.
Client: Daewoo Nig. Ltd.
132002
Description: Repairs, Installation and testing of protective device,Oil draining, Oil filtration, refilling, testing and commissioning of 1 No.122MVA
Client: Ajaokuta Steel Co
142002
Description: 132KV ABB transformer Repair and Commissioning of 1 No. 122MVA/132KV ABB transformer motorized tap changer
Client: Ajaokuta Steel Co.
152003
Description: Testing and Recertification of HV/ LV Cables and Switch gears at NNPC Escravos Electrical Substation
Client: Daewoo Nig. Ltd.
162003
Description: NNPC Tank Farm TK107 substation Installation, testing and commissioning of NNPC Tank Farm TK107 cathodic protection system atE scravos.
Client: Daewoo Nig. Ltd
172003
Description: SPDC Bonny Terminal Additional Fuel Gas Plant High Voltage equipment installation, cable splicing/termination, testing and commissioning of 11KV Electrical substation
Client: ABB Lumus Global
182003
Description: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Installation of heater panels, Inverters, UPSand substation equipment modification project
Client: ABB
192003
Description: Fabrication and installation of HVAC units at NIGERIA AGIP OIL COMPANY (NAOC) Gas Plant Project, Okpai
Client: Daewoo Nig. Ltd.
202003
Description: Fabrication, Lagging and Installation of PVC exhaust ducts chambers for battery rooms & gas turbine exhaust chambers at NAOC Gas Plant Project,Okpai
Client: Daewoo Nig. Ltd.
212004
Description: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Cawthorn Channel AGG Projects / Bonny (BCOT) installation,glanding and termination of HV cable on 33KV transformers and switch gears
Client: Daewoo Nig. Ltd. (DN 38)
222005
Description: SPDC Cawthorn Channel AGG Projects / Bonny (BCOT) transformers oil dielectric strength test,oil treatment, oil filling and commissioning
Client: Daewoo Nig. Ltd. (DN 38)
232004
Description: NAOC OB-OB Gas Plant NLNG Pig Launchers/ Receivers facilities area lighting installation
Client: Daewoo Nig. Ltd. (DN 41)
242004
Description: Fabrication, Lagging and Insulation work on hot gas pipelines at NAOC gas plant project, Okpai
Client: Daewoo Nig. Ltd.
252004
Description: Fabrication, Lagging and Insulation of personnel protection (air-cooler units) at NAOC Gas Plant Project
Client: Daewoo Nig. Ltd.
262005
Description: Revamping/Expansion of Star Paper Mill Plants, Owerrintan mechanical/electrical facilities
Client: Energy Equipment Ltd., Onne
272003/2005
Description: SPDC/Offshore Gas Gathering Facilities Project: Electrical/ Instrumentation installation work,Bonny (Manpower/Logistics)
Client: Willbros Nig. Ltd.
282005/2006
Description: Total/Elf Akogep Facilities Projects: Electrical/ Instrumentation installation work, Bonny (Manpower /Logistics)
Client: Willbros Nig. Ltd.
292006
Description: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Bonny Oil and Gas Terminal Integrated Projects: Mechanical/Manual Electrical Cable Pulling in new facilities
Client: Hyundai Heavy Industry
302006/2007
Description: SPDC Bonny Oil and GasTerminal Integrated Project: Electrical/Instrumentation installation work, HV/LV equipment installation, cable glanding, splicing/termination, Testing and equipment commissioning
Client: Hyundai Heavy Industry
312006
Description: SPDC, AFAM VI IPP Power Project: Installation,Testing and Commissioning of Switchyard Equipment
Client: Daewoo E&C
322007
Description: Mobil Producing Nigeria, Bonny Rivers Terminal Expansion Project: Electrical/Instrumentation installation work, HV/LV cable glanding & termination,testing and commissioning
Client: Daewoo Nig. Ltd.
332007
Description: Opuama Community rural electrification equipment/materials supply, construction, installation and commissioning
Client: AUNL SPDC Warri
342007/2008
Description: Re-routing of 33KV power and fibre optic cables from PS1 to PS2. Installation of power management system panel and termination/splicing of 33KV/24 Core multimode fibre optic cable from SPDC Bonny terminal power supply to SPDC Cawthorn channel gas project
Client: ENL/ SPDC
352009
Description: Oil regeneration and oil dielectric strength test for 2Nos. 15MVA, 4 Nos. 2.5MVA & 2 Nos. 1.5MVA GEPROLEC transformers at Escravos Gas Plant Phase 3 project
Client: Hyundai Heavy Industries
362009/2010
Description: Skilled manpower supply service for construction, Precommissioning and commissioning of Ambatovy Refinery Project, Madagascar
Client: KH Petrotec, Madagascar
372009
Description: Oil regeneration, oil filling and oil dielectric strength testing of Power and Distribution Transformers at Escravos Gas To Liquid project
Client: Southern Gas Constructor
382010
Description: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Kolo Creek 33KV/11KV Electrical switchyard equipment
Client: Daewoo E & C.
392011/2012
Description: Installation and commissioning Equipment, Materials and Skill Manpower supply service for the construction of Gbaram-Ubie Integrated Oil and GasProject
Client: Daewoo E & C.
402012
Description: Construction of 1.6km road at Umusam Kwale
Client: Energia Oil Limited
412011/2012
Description: Transformer pre-commissioning tests, oilregeneration, Radiators installation,oil filling and oil dielectric strength test for 40 Nos.16MVA/12MVA/10MVA/2.5MVA /1.5MVA GEPROLEC Transformers in various Electrical Substation at Chevron Escravos Gas To Liquid project
Client: Southern Gas Constructor
422013/2016
Description: Provision of Instrumentation and Electrical Call Out Contract (2013-2016)
Client: Chevron Nigeria Limited
432014
Description: Abiteye Escravos 16" Gas Pipeline Project Cathodic Protection Installation and commissioning
Client: Chevron Nigeria
442016
Description: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) Otumara DOMGAS –Electrical Switchgear and transformers Commissioning
Client: Daewoo E & C
452016
Description: Meren PP composite submarine cable testing, splicing, termination work
Client: Chevron Nigeria Limited
462017
Description: Testing, splicing, termination and commissioning of Subsea Electro-Optical Power Umbilical; 3 x 240mmSq 19/33 kV + 3x12 optic fiber and 3x120mmSq 19/33 kV+ 3x12 optic fiber cables
Client: SELAH MARINE/ SPDC
472018
Description: Construction of cooling tower foundation for OPAC, Kwale
Client: OPAC Refinery
482018
Description: Construction of 4 Pump Foundation in Kwale
Client: Midwestern Oil & Gas
492018/2019
Description: Okpai Power Station (IPP) 330KV Switchyard installation upgrade and commissioning – Phase2
Client: SIELTE Nig. Limited
502018/2019
Description: EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) Commissioning test of over 20 Nos. switchgear assembly in building 1- 11; comprising of Powell PowlVac Arc Flash Resistant VacuumCircuit Breakers, General Electric Multilin Relays – Models SR469 Motor Management Relay, SR489 Generator Management Relay, SR745 Transformer management Relay, SR750
Client: Westfield Energy Resource / NETCO
512018/ 2019
Description: Feeder Management Relay etc. EXXON MOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) High/Medium voltage cable arrangement, testing,splicing and termination and commissioning test on 8
Client: Tombim Services Limited/ NETCO
522018/2019
Description: Nos. power transformers EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) High/Medium/Low voltage electrical/instrument cable arrangement, testing, splicing and termination and testing/commissioning test of 18 Nos. power transformers
Client: NestOil Limited/ NETCO
532020
Description: Provision of Instrumentation and Electrical Call Out Service Contract (Amendment 5)
Client: Chevron Nigeria Limited
542021
Description: EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) Installation and Tie – In, Commissioning of End Devices (MOVs, RTD Sensors, Pressure Transmitters, Pumps and Actuators
Client: Westfield Energy Resource / NETCO
552020/2021
Description: EXXONMOBIL Major Integrity Projects - QIT Power Distribution Upgrade Project (QPDUP) Restoration and Correction of Fiber Optic Networks, Condensates PLC logic errors, CCR SCADA,HMI graphic display; Replacement of faulty DHRIO modules and dynamic commissioning.
Client: FinanceGuru
562021
Description: ExxonMobil ERHA FPSO Transformers repair/maintenance and Oil filtration/testing
Client: SPIE ENG. SERVICES/ EXXONMOBIL
572021
Description: SPDC Kolo Creek Gas facilty MV Cables VLF testing and Power Transformer Precommissioning test.
Client: Morpol Eng. Services Ltd
582022
Description: SPDC Gbaran Ubie Phase 3A Enwhe Project High Voltage Cable Termination, Testing, Power Transformers and Switchgear Testing and Commissioning
Client: DAEWOO NIG.LTD
592022
Description: EXXONMOBIL ERHA FPSO 2x25MVA Transformers Leaking Bushings Repairs and Filtration/Regeneration.
Client: SPIE Services/ EXXONMOBIL
602022/2023
Description: EXXONMOBIL ERHA FPSO Danfoss Systems Cable Laying, Glanding,Termination and Testing
Client: EXXONMOBIL/ LES Energy
612023
Description: EXXONMOBIL ERHA FPSO Troubleshooting and Execution of DNV Electrical and Instrumentation work
Client: EXXONMOBIL/ LES ENERGY
62On-going
Description: DEXXONMOBIL ERHA FPSO Danfoss System Restoration- HPU Troubleshooting and repairs
Client: EXXONMOBIL/ LES ENERGY
632023
Description: MADU CSP OFFSHORE Platform Flexible Risers and Medium Voltage Umbilical Cables underwater Laying and Repair
Client: FIRST E &P
642023/2024 On-going
Description: NNPC Kaduna Refinery Quick-Fix Project: Construction, Installation and Commissioning of MV/LV Electrical Substations, includingprovision of Distribution Transformers.
Client: Daewoo Engineering Ltd
652024
Description: NNPC Warri Refinery Quick-Fix : Installation and commissioning of Digital metering units for 33KV, 6.6KV and 3.3KV Switchgears in 7nos. Electrical Substations
Client: NNPC/WRPC
66On-going
Description: EXXONMOBIL ERHA FPSO Faulty Transformers repairs and overhauling
Client: SPIE/EXXONM OBIL
67On-going
Description: Equipment Rental/Materials/Skill Manpower supply services
Client: Various Clients

Our Clients